BIG TILE FLOOR DONE!

With the exception of a couple finishing details, the living room floor is DONE! We are just so wildly excited; this place is now a house for sure!

In the last week-and-a-half, tile by tile, Hanibal worked his way across the entry/living/dining room floor. My job as usual was to cut all the perimeter tiles. Here we work around the steps to the master bedroom:

P1010907While we were in the neighborhood, we decided to set the tiles for this set of steps, too. In the next photo Hanibal places mortar and I stand squat ready with a jig that I made to determine the height of the mortar on the steps:

P1010916-001

The next photo is a closer look at the jig — I measured the total height of the staircase and then divided by three (the number of risers), equaling even steps of four-and-three-quarters-inches. To that number, I added the thickness of the tile (five-sixteenths-of-an-inch) to yield a jig height of five-and-one-sixteenth-inch. In the shop, I cobbled together a few boards, making this:

P1010920-001

The jig rides on the tiles already in place on the step above the one being worked on, thereby setting the height of the mortar to set the tiles on.

We decided to tile the steps with some left over tile from the bathroom floors. The different style of tile sends a safety warning to a person walking nearby that says, “pay attention, something is different here.” Here is the end of one of the steps where I cut the tiles to fit against the rock wall:

P1010923-001

We still need to install tile on the risers and grout the staircase.

Finally, with the exception of a few finishing touches, the floor was done. Here it is looking from the living room toward the front door. The little set of stairs at the far end goes to the second bedroom:

P1010943-001

We planted some Mother-In-Law Tongues in concrete pots on the landing.

And looking from the front door into the living room:

P1010952-001

The next photo looks from the master bedroom landing into the living room:

P1010949-001

We went shopping on Black Friday and got some good sales on some big pots for the living room.

You may have noticed in the above pictures that the long container wall, the one with the long bench, is no longer white. Hanibal didn’t need me for a day, so I painted the wall two coats of a warm-grey satin latex. I’ve found that a brush works just fine to paint the container walls:

P1010938-001

Once I got two coats of paint on the wall, both Cynthia and I commented on how tranquil the room had become. We think that this tranquility will make a great backdrop for a few vibrant punches of color:

P1010936-001

One of those punches of color will be the dining room table. One day I had a chance to roll five coats of “Red Hot Mama” polyurethane (fifteen-minute drying time) paint onto the table that Ramiro and I made some months ago. The name of the color is written on the can in English — I translated it for the guys and they couldn’t stop laughing:

P1010922-001

A thick slab of glass will top the table. After painting the inside corners with a brush, I found that a small foam roller applies a nice smooth finish. When you look at the front windows you’ll notice some squiggly lines. Cynthia put those up with a yellow highlighter so the birds wouldn’t try to fly into the windows. Apparently the birds see the lines”fluoresce” and we’ve avoided many head-on collisions.

With the big floor done, it was time to move upstairs to tile the roof deck floor. We laid one long row first; Hanibal calls this row El Maestro (the teacher):

P1010928-001

Cynthia inspects the first row. As we near the outside edge, we’ll move the plants inboard so that we can finish tiling the floor. A tarp protects the recently-laid end tiles from an imminent afternoon rain.

On the second day, Hanibal continued laying tile and I spent most of the day marking and cutting the border tiles. I am happy to announce that I have officially cut THE VERY LAST TILE that abuts the intricate innies and outies of the container walls. Glad to have that done!

P1010933-001

With so much mortar and tile to carry up to the roof, Hanibal brought his son-in-law, Francisco, to be his helper. Francisco had to do double duty with the edge tiles — after bringing them up to the roof, I marked them, he carried them back down to the saw, I cut them, and he carried them back upstairs. You really don’t want to carry more than five of these tiles at a time as they are thick and heavy. Here is Francisco ready to hand a tile to Hanibal:

P1010935-002

When a new guy comes to work for us, I take his picture and send him home with a copy. The next day they always come back smiling, saying that their family responded, “Guapo!” (pronounced wappo), or “handsome.” This was the photo I gave him.

As of today, the roof deck looks like this:

P1010947-001

The roof deck pitches about a quarter-inch-per-foot toward the outside to shed rain. Armando’s job this Saturday was to grout the floor, making a space ready to move the plants to.

The rainy season is going out with a bang — we’ve had some pretty good downpours in the afternoons and also in the hours just before dawn. Here is one at two in the afternoon — we are really happy with the water management on the property:

P1010911

As wet as it looks, we’ve also had some lovely sunny days. The rainy season will end around December 15th.

Once the roof deck is done, the last big tile job is the front steps. We’ll probably get started on that project sometime this week. Can’t wait.

That’s all for now. Thanks for stopping by.

 

10 thoughts on “BIG TILE FLOOR DONE!

  1. How exciting for sure!! My Favorite photo here is from the master bedroom entry looking at the beautiful tiled stair-wall and the fabulously tiled floor. Cynthia mentioned that you had furniture coming so that with the “Red Hot Mama” dining room table and you can be featured in Architectural Digest!

  2. Good morning Fred,
    Wonderful blog post, you and your guys have done an amazing amount of work, especially all those tile cuts..you must be so pleased with the result.
    Because you have been getting all this rain, all those plants you planted must be thriving..it sure was a great photo of the water coming off the roof.
    Well done!
    Cheers,
    Dagmar

    • Hi Dagmar,

      Construction can have phases where things seem to crawl or conversely, move really fast. Although the tile is going in one-by-one, the project really seems to be zooming right now. And yes, the plants are quite happy. We would fertilize them, but the rain would wash it right away! Thanks for your comment Dagmar. Fred

  3. Hi Fred, I haven’t worked with tile much but wondered if you have any problems with grout shrinking and cracking? Do you use a grout sealer?

    I for one am so happy to see you and Cynthia enjoy the fruits of your labor more and more.. The home is beautiful,,,,I must admit I was skeptical at first.
    Best wishes,Don.

    • Hi Don,

      As to grout (lechada in Spanish), I use a polimer modified grout. Basically, the sealer is in it, and the polimer prevents the shrinking that can happen with a non-modified grout.

      Thanks very much for your comment and compliment. By the way, I’m STILL skeptical that I can pull this off! Fred