Now that the dry season is here, we are making good progress on my shop. All the interior walls are repello-ed (stuccoed) and the roofing metal has been delivered. Here are some photos of walls being finished:

Armando works a wall

We call this little closet "the phone booth"

Gusty winds come with the dry season, so we geared up with ropes and clamps and extra bodies to keep the 24-foot-long roof panels from blowing away. Here we are placing the first panel on the east side of the shop:

Armando and I place the first panel. Gloves are mandatory when working with these over sized razor blades.

Up goes the second panel

After lifting and placing each panel, Sammy and I go up on the roof. He sits on the bottom end of the metal to keep it from becoming airborne, and I take a straight edge and a Sharpie marker and mark locations for screws. Armando follows me, placing a few screws to keep the panel in place.

Break time at the half way mark. Sunglasses are mandatory while working on the highly reflective roofing. Later, much later, the roof will extend out another 15 feet over the carport.

After all the panels were in place, Armando and Sammy went back over the roof and placed the missing screws. What a beautiful day in the tropics!

I included a six-foot roof overhang on the west end of the shop. Below the roof there will be an outside sink, a clothes line, and space for potting plants, etc. It is also a place that Armando can wait out a rainy season deluge. Maybe a hammock is in order:

The larger window is in my shop, the smaller window is in the bathroom.

Here are some inside shots with the roof on:

Now that the roof is finished, I can remove the temporary center stick. It reduced the bounce while working on the roof.

We were finished with the roof about 2:30 so I sent the guys home. Armando proclaims the roof “listo” (LEEZ-to — done, ready):

Will he walk the plank?

Tomorrow Armando and Sammy will go back to repello-ing the remaining bathroom walls.

My job for the day will be to clean up the repello on the interior walls. There are some trowel marks and a few rough edges here and there that need attention before paint. I’m going to start out using a wet angle grinder with a diamond polishing wheel and we’ll see how it goes.

After cleaning up the walls, I’ll make the final decision — white paint or clear polymer finish? I’m leaning toward the polymer as it won’t show the inevitable scuff marks, although the white would make the shop a bit brighter.

After the walls are finished, I can mount the electrical boxes and conduit. I plan on running most of the conduit under the floor slab. I don’t like horizontal conduit because it is a dust collector.

Then we can pour the floor slab and make the front door. Move in is in sight!

That’s all for now. Arf!