Trimming The Big Roof & Prepping The Big Floor & Framing The Walkway Roof

I think I’ll start this post with a little bit of nonsense:

P1010822-001

Now on to work: There was a break in the rain one morning so I took to the roof to cut the west edge of the roof panels. I tried a saber saw, but the blade was just a tad too short. So I switched to the reciprocating saw with a fine metal cutting blade. It was noisy but did the job just fine. Here is the job nearly done; you can see the 2×4 metal carriola that I used as a rain gutter:

P1020556

Here is a longer view with the angle all trimmed:

P1020559

I’m taking this picture from the roof over the master bedroom.

With the persistent rain, I decided to start preparing the Big Floor for concrete. First I needed to fill the open space between the Big Floor and the bottom of container #3. I decided to use the stack of scrap M2 panels (wire mesh covered foam panels) that we stored under the containers. For a year now I’ve been wondering how I would get rid of them; unused, they would have become bad landfill.

P1020551

When I had the foam all installed, I cleared the floor. Next I screwed a long 2×6 carriola to the two columns on the living room west wall doorway. I set the 2×6 to what will be the height of the concrete floor. I dragged in the first of about 50, half-inch rebars:

P1020564

I made a grid with the rebar and tied each intersection with tie wires. You can buy the wires all prepared, but it was easy to make them with a roll of baling wire. Cynthia and I made two boxes of ties while we were watching the third- or fourth-time rerun of CSI:

P1020566

Next, I had to raise the rebar off the floor so that it will sit in the middle of the slab. Rebar chairs, as they are called, are made by perhaps hundreds of manufacturers. But I had a bunch of scrap 2×4 metal carriola cutoffs that I thought would serve just fine. Here is a short video of me cutting three of the 300 DIY rebar chairs. You can’t have more fun than this:

Next is the Big Floor with the rebar in place, tied, and raised on my DIY rebar chairs:

P1020573

Here is a closeup:

P1020578

I like this view from the top of #2. This is where the stair landing will be:

P1020579

I spent a few more hours installing electrical conduit and water piping that will come through the floor, and then set up a wheelbarrow ramp. Armando and I have made a plan to pour the floor next Tuesday:

P1020582

Ready to pour concrete!

With the Big Floor ready for concrete, I moved back outside to frame the corner of the roof over the walkway that goes from the house to the carport. This involved raising a 4×4 steel column, just like the one at the other end of the front window wall. This column weighs about 130 pounds. Armando was busy cutting grass at the rental house, so I needed my friends Rope and Pulley to get it standing vertical. First I rigged braces that I could clamp to the column when I had it in place and plumbed straight up and down. In the next picture you can see the column (resting on the saw horse), ladders, rope, the orange pulleys, and stabilizing braces:

P1020585

I put a few concrete nails where the column will sit to keep the column from kicking out of position when I raise it. Ultimately, I’ll weld a piece or two of rebar from the column to the existing rebar in the slab:

P1020586

A little pulling on the rope and it’s up, all clamped into place:

P1020587

Next I cut and welded into place the shorter of the two beams:

P1020595

Then I wrangled the longer beam into place, marked it, and cut it to length:

P1020596

Here I am slowly and cautiously moving the second beam into place.

I managed to get both beams welded into place before my energy ran out for the day. I’ll be back at it on Monday. The photos in the next post will make this geometric roof puzzle more clear.

In other news, I came upon a YouTube video made by a company named BigSteelBox. It shows how shipping containers are made. Apparently there is newer technology with more automated factories, but this video shows the old school way of making containers. I was impressed by the amount of physical labor that went into making these precision steel boxes:

Hot dog on the griddle; Jabo suns himself on a piece of roof panel:

P1020561

This can’t be a comfortable tanning bed, but he does it every day!

And here is a pretty hibiscus in the garden:

P1020568

That’s all for now. Next it’s, “Armando… concreto!”

12 thoughts on “Trimming The Big Roof & Prepping The Big Floor & Framing The Walkway Roof

  1. Wow incredible progress the big roof and big floor projects are really bringing the big picture into view. Loving the blog.

  2. Morning!
    I don’t know if I can make it through the big concrete pour!? I just finished mixing 14 eighty pound bags in my mixer for a new shed floor. Just getting my fingers straightened out to type is painful. haha
    Great job and hoping one day to see all this in person.

  3. Fred , am sure you have overdone the big pour, health wise , looking forward to your next post ( as all ways ) last two posts , were great progress really standing out as to the house getting built suggest a few days off to smell the roses , again , great posts , great pics regards mike

  4. I am loving your site…what an inspiration. I will be starting my container project this summer. Learning from yours is very helpful. Thanks

Leave a Reply

Your email address will not be published. Required fields are marked *